Demolition.
Automated.

A selective interior demo on a 1960s commercial building has asbestos-containing materials in the floor tile, the pipe insulation, and the drywall joint compound. You walked the site. You saw the tile. You didn't document it in writing before signing the contract. Now you're three days in and the GC's air quality monitor flagged a reading. Everyone is looking at the demo contractor. Pre-demo surveys and documentation aren't just best practice in demolition -- they're the difference between a clean job and a six-figure liability exposure. SYNTAX builds the documentation layer that protects your operation from the moment you sign the contract.

What's costing you bids and creating liability exposure

Demolition is permit-dependent, hazmat-adjacent, and heavily documentation-sensitive. The margin lives in clean bid execution and airtight pre-demo records.

Commercial Bid Response Speed

A GC coordinating a commercial demo package needs a price and a schedule before they can finalize their own timeline. The demo contractor who turns around a unit-price bid within 48 hours -- linear footage of partition, square footage of floor, tonnage estimate of debris, and a separate line for any potential hazmat work pending survey results -- moves to the short list. The contractor who needs a week to price a demo that the GC can eyeball from the plans is competing for the job that wasn't awarded to someone else.

Pre-Demo Hazmat Survey and Documentation

Asbestos-containing materials (ACMs) are present in almost every commercial building built before 1980 and many residential buildings built before 1990. Floor tile, pipe insulation, joint compound, ceiling tile, and roofing materials are the common locations. A signed contract that includes a pre-demo survey requirement -- and a survey that documents all sampled materials before work begins -- creates the record that separates permitted, documented demo work from the kind that generates an EPA or OSHA investigation.

Debris Disposal and Weight Ticket Tracking

A commercial interior demo generating 40-60 tons of material needs to go to a licensed facility, and the weight tickets need to be kept for the project record. Some jurisdictions require disposal documentation as a permit close-out item. A demo contractor who can produce every weight ticket from every load on a project -- on demand, at permit close-out, or in a dispute -- runs a clean operation. One who reconstructs from memory runs a risk.

Permit Sequencing and Inspection Coordination

A structural demolition permit in most municipalities requires a pre-application meeting, a structural engineer's demolition plan, a utility disconnect confirmation from all utilities, and in some cases a neighboring property survey. The permit takes 2-6 weeks. If the GC's schedule has demo starting week 2 and the permit isn't applied for until week 1, someone has a problem. Tracking the full permit sequence with follow-up at each step keeps the demo schedule aligned with the GC's project timeline.

Implementations for every
size of operation

The problems are the same at every scale. The build is different. Here is what SYNTAX deploys depending on where your operation is right now.

Owner-Operator
1-2 crews
You're bidding, demo'ing, and billing. SYNTAX logs the pre-demo survey, tracks the permit sequence, and logs every weight ticket automatically against the job record.
Pre-demo documentation workflowPermit sequence trackingWeight ticket logging by load
Growing Company
3-8 crews
You're running residential and commercial demo simultaneously and the permit management and hazmat documentation need a system. SYNTAX manages the pre-demo survey checklist, permit status across all active jobs, and disposal documentation.
Pre-demo survey by jobPermit status across all jobsDisposal documentation by project
Established Demo Contractor
Commercial + structural
At this scale the commercial bid pipeline and regulatory compliance are the business. Which active jobs have open permit items? Which bids are in the follow-up window? Which jobs have unclosed weight ticket logs? SYNTAX builds the data layer.
Commercial bid follow-up pipelineRegulatory compliance trackingWeight ticket audit by job

What we build for your operation

We do not sell software subscriptions. We build the automation layer on top of the tools you are already running and deploy it fast.

Pre-Demo Survey
Hazmat Documentation Before Work Begins

Contract signed: pre-demo survey checklist initiated. All suspect materials identified and sampled per survey protocol. Survey results logged against job address. Hazmat present: licensed abatement required before demo begins -- GC or owner notified in writing with survey findings. All clear: demo permit application proceeds. Survey documentation stored permanently.

Contract signed: survey initiated
→
All suspect materials sampled
→
Results logged by job address
→
Hazmat found: written notification + abatement before demo
Permits
Demo Permit Sequence Tracking

Permit application submitted: tracking number logged, expected window noted. Utility disconnects required: each utility tracked separately with confirmation. Inspection scheduled: all parties confirmed 48 hours in advance. Permit issued: demo start confirmed against project schedule. Permit delay: GC notified with revised timeline.

Application submitted: tracking logged
→
Utility disconnects: each tracked
→
Inspection: all parties confirmed 48 hrs
→
Delay: GC notified with revised timeline
Disposal
Weight Ticket Logging + Disposal Records

Each load leaving site: disposal facility, weight ticket number, tonnage, and material type logged. Photo of weight ticket stored against load record. Project complete: full disposal summary generated showing total tonnage by material type and all facilities used. Available for permit close-out or regulatory request in 5 minutes.

Each load: facility, ticket, tonnage logged
→
Weight ticket: photographed + stored
→
Project complete: disposal summary generated
→
Available for permit close-out in 5 min
Billing
Milestone Billing + Final Invoice

Mobilization complete: mobilization invoice sent. Each phase complete (selective interior, structural, site prep): phase invoice sent. Final site clear and permit closed: final invoice. Weight ticket log attached to final billing packet. Follow-up day 3, 7.

Mobilization: invoice sent
→
Each phase complete: phase invoice
→
Site clear + permit closed: final invoice
→
Weight ticket log in billing packet
Zero
undocumented pre-demo surveys -- every job starts with a logged hazmat record before the first tool hits the wall
5 min
full disposal documentation produced for permit close-out or regulatory request from the weight ticket log
4-6
weeks average payback window -- through faster bid conversion, permit efficiency, and milestone billing
48
hrs from kickoff to first deployed system running live in your operation

We built these systems
because we needed them first.

SYNTAX came out of Phase III Construction -- an insurance restoration contractor running 5-12 simultaneous jobs across SE Michigan since 1993. Different trade, same structural problem: missed calls, slow collections, callbacks with no data, and jobs that stall when the communication cycle drops. We built these systems because we were the ones bleeding time and margin without them. The same systems that fixed our operation are what we deploy for yours.