Industries / Trades & Home Services

Excavation + grading.
Automated.

Underground utilities exist where they exist, not where the locates said they were. You hit a gas line that was 18 inches off the marked location. Operations stopped for 4 hours, the GC is asking who is paying for the delay, and you have no documentation that the locate was marked before you started or that the discrepancy was reported immediately when you found it. Excavation work has the highest liability exposure of any trade -- when something goes wrong underground, the question is always 'did you call for locates and did you dig to plan?' SYNTAX builds the documentation layer that protects you when that question gets asked.

What's eating your bid conversion and field margin

Excavation is permit-dependent, utility-adjacent, and scope-change-heavy. The margin lives in accurate bid quantities, documented field conditions, and change orders that get signed before the machine moves.

Commercial Bid Quantity Takeoffs and Follow-Up

A commercial site package -- rough grading, utility trenching, storm drainage, and final grade -- has 12-20 line items that need accurate quantities before pricing. Estimating cut/fill on a 3-acre commercial lot without a solid takeoff from the civil plans leads to one of two outcomes: you bid too low and absorb the overage, or you bid too high and lose the job. The contractor who submits a detailed bid within 48 hours of the RFP -- with cut/fill quantities, haul distance to the disposal site, and a line item for rock if the soil boring shows it -- is the one the GC calls when they have questions before award.

Underground Utility Locate Documentation

Illinois call-811-before-you-dig is the legal requirement. The locate ticket number is the documentation. But a locate ticket and marked utilities 2 feet from where your machine needs to be are two different things. A crew that marks the locate ticket, photographs the markings before breaking ground, and documents the utility depth when exposed has a complete record if anything goes wrong. A crew that calls 811, sees the stakes, and starts digging has a ticket number and nothing else.

Field Scope Changes Without Signed Change Orders

A residential basement excavation finds unexpected ledge rock at 4 feet -- the spec assumed soil to 8 feet. Rock removal costs 3-4x the soil removal rate. The homeowner is standing next to the machine when the foreman calls. The foreman says 'we can keep going but it's going to cost more.' The homeowner says 'yeah go ahead.' Nobody signs anything. At billing, the homeowner remembers saying 'go ahead' but not agreeing to a specific number. A change order generated on-site from the foreman's phone -- scope change described, unit cost and quantity estimated, homeowner approves via text -- closes the issue in 5 minutes.

Equipment and Operator Utilization Across Jobs

An excavation company with 3 excavators, 2 dozers, and a motor grader has a scheduling problem: which machine is on which job, when does each job need which equipment, and what's the transition time between sites. An excavator finishing a residential project on a Friday that's needed on a commercial site Monday 25 miles away needs to move on Friday -- not be discovered Monday morning when the operator shows up to the wrong yard. Equipment scheduling across multiple active jobs prevents the Monday morning scramble.

Implementations for every
size of operation

The problems are the same at every scale. The build is different. Here is what SYNTAX deploys depending on where your operation is right now.

Owner-Operator
1-2 machines
You're bidding, operating, and billing. SYNTAX documents the locate before every dig, logs every scope change from the field, and invoices at each project milestone.
Pre-dig locate documentationField change order from phoneMilestone invoicing
Growing Company
3-8 machines
You're managing multiple simultaneous jobs and the equipment scheduling and change order management need a system. SYNTAX tracks every active job with equipment assignment, locate status, and open change orders.
Equipment scheduling across jobsMulti-job locate trackingChange order pipeline by project
Established Contractor
Commercial site work
At this scale the commercial bid pipeline and subcontractor coordination are the business. Which bids are in the follow-up window? Which active jobs have open scope change requests that haven't been signed? SYNTAX builds the data layer.
Commercial bid follow-up pipelineOpen change order trackingSubcontractor coordination schedule

What we build for your operation

We do not sell software subscriptions. We build the automation layer on top of the tools you are already running and deploy it fast.

Locates
Pre-Dig Utility Documentation

Locate ticket called: ticket number and date logged. Markings on-site: photographs taken showing all markings visible. Exposed utility: depth and offset from marked location logged and photographed. Discrepancy from locate: GC or property owner notified in writing before proceeding. All documentation stored against job address permanently.

Locate ticket: number and date logged
→
Markings: photographed before breaking ground
→
Exposed utility: depth and offset logged
→
Discrepancy: written notification before proceeding
Change Orders
Field Scope Change Documentation

Foreman encounters changed condition: change order generated from phone. Scope of change described, unit cost, quantity estimate, and total impact included. Sent to property owner or GC for approval by text or email. Approval received before work continues. All change orders accumulate in project file and roll into final billing.

Changed condition found: change order generated
→
Scope, unit cost, quantity included
→
Approval by text before work continues
→
Rolls into final billing automatically
Bids
Commercial Bid Tracking + Follow-Up

Bid submitted: day 3 follow-up scheduled with a specific field observation from the plan review. Day 7: email with a relevant project consideration. Day 14: final check-in. All bids tracked with submitted date, last contact, and next action. Won/lost logged with reason.

Bid submitted: day 3 follow-up
→
Day 3: plan-specific observation
→
Day 7: project consideration
→
Day 14: final touch
Equipment
Machine Scheduling Across Jobs

Each machine assigned to a job with start date, expected completion, and next job queued. Machine completing: next job notified 48 hours in advance. Move required: transport scheduled with machine and job confirmation. All equipment visible against the 2-week job schedule.

Machine assigned: job + dates logged
→
2 days before completion: next job notified
→
Move required: transport scheduled
→
All machines visible on 2-week schedule
Zero
locate documentation gaps -- every dig starts with a photographed locate record stored permanently against the address
Same day
field change orders signed before the machine moves -- no end-of-project scope disputes on changed conditions
4-6
weeks average payback window -- through faster bid conversion, captured field change orders, and milestone billing
48
hrs from kickoff to first deployed system running live in your operation

We built these systems
because we needed them first.

SYNTAX came out of Phase III Construction -- an insurance restoration contractor running 5-12 simultaneous jobs across SE Michigan since 1993. Different trade, same structural problem: missed calls, slow collections, callbacks with no data, and jobs that stall when the communication cycle drops. We built these systems because we were the ones bleeding time and margin without them. The same systems that fixed our operation are what we deploy for yours.

See what's possible in 30 minutes

Book a free workflow audit. We'll map your current operation, show you exactly where the hours and margin are going, and walk you through what your operation looks like with those gaps closed. 30 minutes. No software to buy. No long-term contracts.

Book a Free Workflow Audit

Not sure yet? Run the ROI calculator first →