Foundation repair.
Automated.

The homeowner called about a crack in the basement wall. Your crew digs the exterior, exposes the footing, and finds active water infiltration and a section of block that's compromised beyond the original scope. The estimate was $4,800. The actual scope is $11,200. The homeowner is surprised. Without documented evidence of the discovered condition and a signed change order before you proceed, the billing conversation at the end of this job is going to be difficult. Foundation work is inherently discovery-dependent. SYNTAX builds the documentation layer that protects you when the scope changes.

What's compressing your margin

Foundation repair work is discovery-driven, permit-dependent, and high-dollar. Every gap in documentation or billing discipline costs significant money.

Scope Discovery After Excavation

The most accurate foundation assessment happens after the dirt is moved. Block deterioration, failed drain tile, compromised footings, and hydrostatic pressure damage are often more extensive than the surface inspection suggests. Scope expansion after excavation is normal -- the problem is when it's undocumented. A change order with photos at the moment of discovery, presented before the repair work proceeds, protects the billing at closeout and sets the homeowner's expectation correctly.

Engineering and Permit Delays

Helical piers, wall anchor systems, and carbon fiber strap installations for wall stabilization often require an engineer's stamp and a permit. The permit application needs the engineering drawings. The drawings take 5-10 business days. If the permit application isn't placed immediately after the engineering order, that's 2 weeks of idle time before a single pier is driven. Tracking the engineering and permit timeline actively -- with follow-up triggered at each step -- keeps the job moving instead of stalling in an administrative queue.

Warranty Documentation for Structural Work

Foundation repair carries transferable warranties from system manufacturers (Supportworks, EverDry, Basement Systems). Those warranties are attached to the installation record -- pier depth and bearing capacity, anchor plate torque specifications, strap tension, drain tile specifications. Without that documentation, the warranty is theoretical. A homeowner who sells the house in 3 years needs the transferable warranty documentation from the original install. Crews that log installation specs completely make the warranty real.

Financing Follow-Up on Large Ticket Jobs

A $14,000 helical pier installation is a purchase that many homeowners need to finance. If you offer financing at the estimate but don't follow up when the homeowner says 'I need to think about it,' the job goes to whoever calls back first with a financing option. Foundation repair is a high-concern, high-urgency purchase category -- homeowners want to address it, but sticker shock creates hesitation. A structured follow-up sequence that addresses the financing path keeps the estimate alive.

Implementations for every
size of operation

The problems are the same at every scale. The build is different. Here is what SYNTAX deploys depending on where your operation is right now.

Owner-Operator
1-2 crew
You're estimating, installing, and billing. SYNTAX documents scope discoveries immediately, tracks your permit and engineering timeline, and follows up on open estimates with financing options.
Scope discovery change order on-sitePermit + engineering timeline trackingEstimate follow-up with financing option
Growing Shop
3-8 crew members
You're running multiple jobs and the permit coordination and change order documentation need to be systematic. SYNTAX manages both across all active jobs with automatic follow-up at each step.
Multi-job permit trackingChange order status by jobEstimate pipeline with financing follow-up
Established Company
Regional presence
At this scale the warranty documentation and recurring referral business are the margin. Which realtor and home inspector relationships are generating the most referrals? Which warranty registrations are approaching transferable window? SYNTAX builds the data layer.
Warranty registration + transfer trackingReferral source performanceJob margin by repair type

What we build for your operation

We do not sell software subscriptions. We build the automation layer on top of the tools you are already running and deploy it fast.

Scope
Discovery Documentation

Excavation reveals additional scope: photos taken immediately showing the discovered condition. Change order generated on-site with description, photos, and cost impact. Homeowner receives it by text with a one-tap approval. Work on the additional scope does not proceed until approval is received.

Condition discovered
→
Photos taken on-site
→
Change order generated + sent
→
Homeowner approval received
→
Work proceeds
Permits
Engineering and Permit Timeline

Engineering order placed: 10-day delivery tracked. Day 7: follow-up to engineer. Drawings received: permit application placed same day. Permit processing tracked. Permit issued: job scheduled within 48 hours. Every step has an owner and a due date.

Engineering ordered: 10-day tracked
→
Day 7: follow-up
→
Drawings received: permit filed
→
Permit issued: job scheduled
Installation
Warranty Baseline Documentation

Each repair system logged: pier depth and bearing capacity (helical), anchor plate installation and torque specs (wall anchor), strap tension and spacing (carbon fiber), drain tile specs and sump pump model (drainage). Manufacturer serial numbers logged. Photos at each install stage. Warranty registration submitted within 48 hours of job completion.

System installed: specs logged
→
Manufacturer serials recorded
→
Photos at each stage
→
Warranty registered within 48 hrs
Collections
Estimate Follow-Up + Invoice

Estimate sent: follow-up at day 3 with financing option. Day 7: second follow-up. Day 14: final touch. Job complete: invoice sent same day. Commercial or insurance-related work: draw schedule with milestone triggers.

Estimate sent
→
Day 3 follow-up + financing
→
Day 7 second touch
→
Day 14 final
→
Job complete: invoice same day
Zero
billing disputes at closeout when every discovered scope expansion has a signed change order before work proceeds
10 days
engineering delivery tracked with day 7 follow-up -- no permit delays from drawings that sat in an inbox
4-6
weeks average payback window -- through scope documentation, permit efficiency, and warranty capture
48
hrs from kickoff to first deployed system running live in your operation

We built these systems
because we needed them first.

SYNTAX came out of Phase III Construction -- an insurance restoration contractor running 5-12 simultaneous jobs across SE Michigan since 1993. Different trade, same structural problem: missed calls, slow collections, callbacks with no data, and jobs that stall when the communication cycle drops. We built these systems because we were the ones bleeding time and margin without them. The same systems that fixed our operation are what we deploy for yours.

See what's possible in 30 minutes

Book a free workflow audit. We'll map your current operation, show you exactly where the hours and margin are going, and walk you through what your operation looks like with those gaps closed. 30 minutes. No software to buy. No long-term contracts.