Industries / Trades & Home Services

Glazing + storefront.
Automated.

Custom glass is built to the field measure. The field measure for a 12-foot storefront system was taken before the slab was finished. The slab finished 1/4 inch high on the left side. The frame went in tight. The glass is cut to the original measure. It doesn't fit. The glass is custom-cut and non-returnable. The recut costs $800 and 3 weeks. On a $22,000 storefront package, a single measure error on one unit can eliminate the margin on the job. Glazing work is measure-critical at every stage: opening, frame, and glass. SYNTAX builds the documentation chain that prevents the expensive recut.

What's eating your margin on glazing jobs

Glazing combines high material cost, custom-fabricated non-returnable product, and tight installation tolerances. The margin lives in measure accuracy and field condition documentation.

Commercial Storefront Bid Turnaround

A GC building out a 12-unit retail strip center needs storefront pricing for 3 bids before they award the package. The glazing sub who turns around a complete bid in 48 hours -- unit-price by opening type, aluminum system spec, glass type, hardware allowance, and installation -- gets called first when there are questions. The one who needs 2 weeks to price a standard storefront system is competing for jobs the GC already awarded.

Field Measure Sequencing on Multi-Stage Construction

A storefront installation on a new commercial building has multiple field measure points: rough opening measured after framing, opening confirmed after slab, frame measured after install for glass order. Each step has to happen in sequence and the glass order can only be placed after the frame is installed and measured. A measure taken before the slab is finished, or a glass order placed from the rough opening dimensions instead of the installed frame, leads to a recut. Tracking the measure sequence and blocking the glass order until the frame measure is confirmed prevents the expensive mistake.

Warranty Documentation on Insulating Glass Units

An insulating glass unit (IGU) fails -- seal failure, condensation between lites -- typically 3-7 years after installation. The IGU manufacturer warranty covers the unit if it was installed to spec: proper edge clearance, correct setting block, glazing compound applied correctly. Without installation documentation, the warranty claim is your word against the manufacturer's test. An installation record that documents clearances, setting block locations, and glazing compound application for each unit -- with the unit's serial number -- is the record that makes the warranty claim straightforward.

Multi-Project Commercial Scheduling

A glazing crew on 3 simultaneous commercial jobs -- a bank, a dental office, and a retail storefront -- has a sequencing problem: you can't install glass until the frame is in, and you can't frame until the rough opening is confirmed, and the GC controls when both happen. A glazing sub who tracks the status of every opening on every active job -- 'bank is ready for frame, dental is waiting on rough opening confirmation, retail is ready for glass order' -- and communicates status to the GC proactively stays on the schedule instead of being the reason the GC's punch list slips.

Implementations for every
size of operation

The problems are the same at every scale. The build is different. Here is what SYNTAX deploys depending on where your operation is right now.

Owner-Operator
1-2 man crew
You're bidding, measuring, and installing. SYNTAX documents every field measure with photos, tracks the measure sequence before every glass order, and invoices at each phase.
Field measure with photo documentationMeasure sequence gate before glass orderPhase invoicing on completion
Growing Shop
3-8 installers
You're running residential and commercial work simultaneously. SYNTAX manages the commercial bid pipeline, tracks every job's measure sequence status, and handles the warranty documentation for every IGU installation.
Commercial bid pipeline with follow-upMeasure sequence tracking by jobIGU installation record + serial logging
Commercial Glazier
Multi-project commercial
At this scale the commercial bid pipeline and installation documentation are the business. Which jobs have open field measure steps? Which are waiting on rough opening confirmation? Which completed jobs have warranty documentation on file? SYNTAX builds the data layer.
Commercial bid follow-up pipelineOpen measure step trackingWarranty documentation by job

What we build for your operation

We do not sell software subscriptions. We build the automation layer on top of the tools you are already running and deploy it fast.

Field Measures
Measure Documentation + Sequence Gate

Rough opening measured: dimensions photographed with tape visible. Slab/finish condition confirmed. Frame installed: frame dimensions measured and photographed. Glass order: only released after frame measure confirmed -- system prevents glass order from being placed from rough opening dimensions. Each measure stored against opening ID and job address.

Rough opening: dimensions photographed
→
Slab condition: confirmed
→
Frame installed: frame measured + photographed
→
Glass order: released only from frame measure
Orders
Glass Order Tracking + Delivery

Glass order placed: order number, unit IDs, and expected delivery logged. Lead time confirmed with fabricator. Delivery approaching: site confirmed ready for installation. Delivery: unit IDs verified against order on receipt. Damaged unit: replacement ordered same day with rush flag.

Order placed: unit IDs and lead time logged
→
Delivery approaching: site confirmed ready
→
Delivery: units verified against order
→
Damaged: replacement ordered same day
Installation
IGU Installation Documentation

Each unit installed: opening ID, unit serial number, edge clearances, setting block locations, and glazing compound application documented. Photo of installed unit stored against opening ID. Unit serial number logged for warranty record. Installation complete: commissioning checklist signed.

Unit installed: ID and serial logged
→
Edge clearances and setting blocks documented
→
Photo stored against opening ID
→
Installation complete: sign-off
Billing
Phase Billing + Warranty Close-Out

Frame installation complete: frame invoice. Glass installation complete: glass invoice. Final punch list cleared: final invoice. Final billing package includes: all measure records, all IGU serial numbers, and warranty documentation. Follow-up day 3, 7.

Frame complete: frame invoice
→
Glass installed: glass invoice
→
Punch list clear: final invoice
→
Billing package includes warranty docs
Zero
glass orders placed before frame measure is confirmed -- the sequence gate that eliminates the expensive non-returnable recut
5 min
IGU warranty claim documentation produced from the installation record -- serial numbers, clearances, and photos from day of install
4-6
weeks average payback window -- through faster commercial bid conversion, eliminated recuts, and phase billing
48
hrs from kickoff to first deployed system running live in your operation

We built these systems
because we needed them first.

SYNTAX came out of Phase III Construction -- an insurance restoration contractor running 5-12 simultaneous jobs across SE Michigan since 1993. Different trade, same structural problem: missed calls, slow collections, callbacks with no data, and jobs that stall when the communication cycle drops. We built these systems because we were the ones bleeding time and margin without them. The same systems that fixed our operation are what we deploy for yours.