Industries / Trades & Home Services

Solar installation.
Automated.

A solar installation has 6-8 approval steps between contract signing and system activation: permit application, HOA approval if applicable, utility interconnection application, inspection, utility meter upgrade, and final interconnection. Each step has a different agency, a different timeline, and a different point of failure. The homeowner who signed 10 weeks ago is asking why their panels are still off. If you don't have a system that tracks every step and communicates proactively, you are spending 30% of your time answering status calls from homeowners who don't understand why they're waiting.

What's stalling your installations and costing you referrals

Solar installations are complex, multi-agency approval processes. The homeowner experience during that process determines whether they refer you to their neighbors -- or complain about you.

Multi-Agency Approval Pipeline

A residential solar installation in Michigan requires: county building permit (5-10 business days), DTE or Consumers interconnection application (4-8 weeks), inspection clearance, utility net metering approval, and final system activation. Each agency operates on its own timeline. If your project manager is tracking all of this manually across 15-20 active projects, something is falling through the queue. A pipeline tracker with automated follow-up at each step and escalation triggers when approvals go past their expected window keeps every project moving.

Homeowner Communication During the Wait

A homeowner who signed a $28,000 solar contract in September and doesn't hear from your company until January when the inspector shows up is a homeowner who is questioning their decision. They're reading Reddit threads about slow solar installs and wondering if they made a mistake. Proactive status updates at each approval milestone -- 'Your permit was approved today, next step is utility interconnection, expected 4-6 weeks' -- keeps the homeowner informed and converts waiting time from anxiety to anticipation.

Utility Interconnection Follow-Up

DTE and Consumers interconnection applications can sit without action for weeks if no one is following up. A submitted interconnection application with no follow-up at week 3 becomes a 10-week wait that could have been 5 weeks. The utility has internal queues and applications that are actively followed up on move faster through the process. An interconnection tracker with automated follow-up at week 2, week 4, and week 6 is the step most solar installers don't have systemized.

Referral Capture at System Activation

The moment a solar system is activated and the homeowner gets their first production reading is the highest-satisfaction point in the entire customer relationship. The homeowner is watching their meter run backwards. They are enthusiastic. If you ask for a referral at that exact moment -- before the excitement fades and the system becomes background infrastructure -- you capture referrals at 3-4x the rate of asking 6 months later.

Implementations for every
size of operation

The problems are the same at every scale. The build is different. Here is what SYNTAX deploys depending on where your operation is right now.

Owner-Operator
Small installation company
You're managing the approval pipeline, coordinating with homeowners, and overseeing installs. SYNTAX tracks every approval step across all active projects, sends homeowners automatic milestone updates, and captures referrals at activation.
Multi-agency approval pipeline trackerAutomatic homeowner milestone updatesReferral capture at activation
Growing Company
10-30 installs per month
You have enough volume that manual pipeline tracking is a real constraint. SYNTAX manages the full approval pipeline across all active projects with escalation triggers, interconnection follow-up, and homeowner communication at each step.
Full approval pipeline managementInterconnection follow-up automationHomeowner communication sequence
Established Installer
50+ installs per month
At this scale the referral program and commercial pipeline are the growth levers. SYNTAX builds the data layer: approval cycle time by jurisdiction, utility interconnection time by utility, referral conversion rate by project type.
Approval cycle time by jurisdictionUtility timeline trackingReferral conversion analysis

What we build for your operation

We do not sell software subscriptions. We build the automation layer on top of the tools you are already running and deploy it fast.

Pipeline
Multi-Agency Approval Tracker

Project signed: approval sequence mapped with expected timelines for each step. Permit submitted: tracking clock starts. Past expected timeline: escalation alert. Step approved: next step triggered automatically. Homeowner updated at each milestone with plain-language explanation of what just happened and what comes next.

Contract signed: sequence mapped
→
Permit submitted: clock starts
→
Past timeline: escalation alert
→
Step approved: homeowner updated
→
Next step triggered
Interconnection
Utility Application Follow-Up

Interconnection application submitted: DTE or Consumers queue tracked. Week 2: follow-up sent. Week 4: escalation to utility account rep. Week 6: second escalation with project file attached. Approval received: homeowner notified, inspection scheduled.

Application submitted
→
Week 2: follow-up
→
Week 4: account rep escalation
→
Week 6: second escalation
→
Approved: inspection scheduled
Communication
Homeowner Status Updates

Each approval milestone triggers a homeowner update: permit approved, interconnection submitted, inspection scheduled, activation date confirmed. Each message is plain-language with the expected timeline for the next step. No technical jargon. No homeowner calls asking 'what's happening with my system.'

Permit approved: message sent
→
Interconnection submitted: message sent
→
Inspection scheduled: message sent
→
Activation date confirmed: message sent
Referrals
Activation Day Capture

System activated: production notification sent to homeowner with first-day generation data. Referral ask included: 'If you know a neighbor or family member who has been thinking about solar, we'd love the introduction.' One-tap referral link. Follow-up at 30 days for non-responders.

Activation: production data sent
→
Referral ask included
→
One-tap referral link
→
30-day follow-up to non-responders
6-8 steps
in every residential solar approval process -- all tracked automatically with escalation triggers when any step goes past expected timeline
Zero
homeowner status calls when every approval milestone triggers an automatic plain-language update
4-6
weeks average payback window -- through faster approval cycles and referral capture at activation
48
hrs from kickoff to first deployed system running live in your operation

We built these systems
because we needed them first.

SYNTAX came out of Phase III Construction -- an insurance restoration contractor running 5-12 simultaneous jobs across SE Michigan since 1993. Different trade, same structural problem: missed calls, slow collections, callbacks with no data, and jobs that stall when the communication cycle drops. We built these systems because we were the ones bleeding time and margin without them. The same systems that fixed our operation are what we deploy for yours.

See what's possible in 30 minutes

Book a free workflow audit. We'll map your current operation, show you exactly where the hours and margin are going, and walk you through what your operation looks like with those gaps closed. 30 minutes. No software to buy. No long-term contracts.

Book a Free Workflow Audit

Not sure yet? Run the ROI calculator first →